Concrete quantities in CY, by element and sheet
Cubic yards for footings, slabs, grade beams, columns, tie beams and other cast-in-place elements as drawn, with slab and forming areas alongside, all traced to the foundation and structural sheets. For Florida contractors bidding residential and light commercial concrete.
What gets counted
Quantities, units and the sheets they come from.
- Footings
- CY and LF by mark from the footing schedule, including grade beams. From the foundation plan.
- Slabs
- SF and CY by thickness and area. Thickened edges and slab steps are listed separately.
- Tie beams & columns
- CY and LF by mark, as drawn. Common on Florida concrete block (CBS) homes, where they are listed per level.
- Forming
- SFCA (square feet of contact area) by element, when you ask for it in the scope.
- Rebar
- Only when it is in your scope and scheduled on the drawings: by bar size and length. Otherwise excluded and listed.
- Under-slab
- SF of vapor retarder where drawn.
Illustrative sample
What the rows look like
| Item | Location | Sheet ref | Qty | Unit | Note |
|---|---|---|---|---|---|
| Slab on grade, 4 in. | Garage | S-101 | 7.4 | CY | Net, no waste added |
| Slab on grade area, 4 in. | Living areas | S-101 | 1,420 | SF | Thickened edges listed separately |
| Continuous footing F1, 20 x 10 in. | Perimeter | S-101 | 9.6 | CY | Per footing schedule |
| Tie beam TB1, 8 x 12 in. | Level 1 perimeter | S-201 | 3.2 | CY | Net, no waste added |
Swipe the table sideways to see every column
Questions log · illustrative
- Q-01 · S-101 · Footing F3 appears on the plan but not in the footing schedule. Confirm its dimensions.
- Q-02 · S-001 · Rebar is shown in typical details only, with no schedule. Rebar is excluded until you confirm whether it is in scope.
Fictional plan set and quantities shown for demonstration only, not a client project. Anything unclear in the drawings is listed as a question for you, not guessed.
How it's measured
Counted from the documents. Traced to the sheet. Questions, not guesses.
01 Net volume
Volumes are net as drawn, with no waste or overpour added. You set your own factor.
02 By element mark
Each footing, beam and column mark from the schedules gets its own row, so a revision to F2 changes one line.
03 Sheet-traced
Every quantity points to the foundation or structural sheet it came from, with the revision.
What stays with you
Your prices. Your estimate.
Concrete and pump pricing, waste and overpour, labor and markup stay with you. We don't design reinforcement or check structural adequacy: we quantify what the structural drawings show.
Scope: reading and quantifying what is drawn, item counts, measurements, and organized lists. Not engineering judgment, not structural calculation, not code compliance review, and not a substitute for a licensed engineer's seal where one is required.
Other trades
FAQ
Common questions
No. Volumes are net as drawn so you can apply your own waste and overpour factor. Each row says so in the note column.
When it is in your scope and the drawings schedule it, by bar size and total length. When reinforcement only appears in typical details, it goes on the questions list instead of being estimated.
If you tell us how you plan the pours, for example footings, then slab, then tie beams, the rows can be grouped that way. Otherwise they are grouped by element and level.
Ask for it in your scope. Whether it can be included is confirmed after the plans are reviewed, before any work starts.
Plans first · Scope review before quote
Bidding concrete? Send the plans.
Scope, turnaround and a fixed price are confirmed with you after the plans are reviewed. Sending them doesn't commit you to anything.