Home / Doors & windows takeoff

Quantity takeoff · Doors & windows

Door and window counts, plan checked against schedule

Every door and window counted by mark, size and type, with the count on the plans checked against the door and window schedules. Mismatches come back as questions before you price a single unit.

What gets counted

Quantities, units and the sheets they come from.

Doors
EA by mark, size and type, interior and exterior separate. From the floor plans and door schedule.
Windows
EA by mark, size and type, with rough opening sizes where scheduled. From the floor plans, elevations and window schedule.
Hardware
EA by hardware set, only where a hardware schedule exists.
Approval numbers
When the schedule lists a Florida Product Approval or Miami-Dade NOA number, it is copied into the row as written.
Shutters
EA or SF of opening protection, where it is drawn or scheduled as its own item.
Trim
LF of casing and frames, when they are in your scope.

Illustrative sample

What the rows look like

Takeoff workbook · illustrativeFictional plan set and quantities
ItemLocationSheet refQtyUnitNote
Interior door, 2'8" x 6'8"Level 1A-6019EAPer door schedule
Exterior door, 3'0" x 6'8", impactFront entryA-6011EAApproval no. as listed
Window W1, single hung, 3'0" x 5'0"Level 1A-6028EAPlan count matches schedule
Window W2, fixed, 2'0" x 4'0"StairA-6022EASchedule lists 3, see questions
Based onSheets A-601 · A-602 · Rev 2

Swipe the table sideways to see every column

Questions log · illustrative

  • Q-01 · A-602 · Window W2: the plans show 2, the schedule lists 3. Confirm the count.
  • Q-02 · A-601 · Door hardware is not scheduled. Doors are counted; hardware is not quantified until confirmed.

Fictional plan set and quantities shown for demonstration only, not a client project. Anything unclear in the drawings is listed as a question for you, not guessed.

How it's measured

Counted from the documents. Traced to the sheet. Questions, not guesses.

  1. 01 Plan against schedule

    Each mark is counted on the plans and compared with the schedule quantity. Both numbers are shown if they differ.

  2. 02 One row per mark

    Size and type come from the schedule, so supplier quotes line up with your takeoff.

  3. 03 Approvals copied as written

    Product approval or NOA numbers are carried over so your supplier quote can reference them. We don't verify approvals or decide which product is required.

What stays with you

Your prices. Your estimate.

Unit prices, supplier selection, installation and markup stay with you. We don't check impact ratings, design pressures or product approvals: whether a product suits an opening is for the design professional and the building department.

Scope: reading and quantifying what is drawn, item counts, measurements, and organized lists. Not engineering judgment, not structural calculation, not code compliance review, and not a substitute for a licensed engineer's seal where one is required.

Other trades

FAQ

Common questions

Both counts are shown and the difference goes on the questions list. You decide which governs, or ask the architect, before the count is final.

No. If the schedule lists a product approval or NOA number, it is copied as written. Whether a product meets the requirements for an opening is for the design professional and the building department.

Only where a hardware schedule assigns sets. Without one, doors are counted and hardware is listed as excluded.

Yes, if they are drawn or scheduled and in your scope, each as its own row.

Plans first · Scope review before quote

Bidding doors & windows? Send the plans.

Scope, turnaround and a fixed price are confirmed with you after the plans are reviewed. Sending them doesn't commit you to anything.

Send your plans