Every door and window counted by mark, size and type, with the count on the plans checked against the door and window schedules. Mismatches come back as questions before you price a single unit.
What gets counted
Quantities, units and the sheets they come from.
- Doors
- EA by mark, size and type, interior and exterior separate. From the floor plans and door schedule.
- Windows
- EA by mark, size and type, with rough opening sizes where scheduled. From the floor plans, elevations and window schedule.
- Hardware
- EA by hardware set, only where a hardware schedule exists.
- Approval numbers
- When the schedule lists a Florida Product Approval or Miami-Dade NOA number, it is copied into the row as written.
- Shutters
- EA or SF of opening protection, where it is drawn or scheduled as its own item.
- Trim
- LF of casing and frames, when they are in your scope.
Illustrative sample
What the rows look like
| Item | Location | Sheet ref | Qty | Unit | Note |
|---|---|---|---|---|---|
| Interior door, 2'8" x 6'8" | Level 1 | A-601 | 9 | EA | Per door schedule |
| Exterior door, 3'0" x 6'8", impact | Front entry | A-601 | 1 | EA | Approval no. as listed |
| Window W1, single hung, 3'0" x 5'0" | Level 1 | A-602 | 8 | EA | Plan count matches schedule |
| Window W2, fixed, 2'0" x 4'0" | Stair | A-602 | 2 | EA | Schedule lists 3, see questions |
Swipe the table sideways to see every column
Questions log · illustrative
- Q-01 · A-602 · Window W2: the plans show 2, the schedule lists 3. Confirm the count.
- Q-02 · A-601 · Door hardware is not scheduled. Doors are counted; hardware is not quantified until confirmed.
Fictional plan set and quantities shown for demonstration only, not a client project. Anything unclear in the drawings is listed as a question for you, not guessed.
How it's measured
Counted from the documents. Traced to the sheet. Questions, not guesses.
01 Plan against schedule
Each mark is counted on the plans and compared with the schedule quantity. Both numbers are shown if they differ.
02 One row per mark
Size and type come from the schedule, so supplier quotes line up with your takeoff.
03 Approvals copied as written
Product approval or NOA numbers are carried over so your supplier quote can reference them. We don't verify approvals or decide which product is required.
What stays with you
Your prices. Your estimate.
Unit prices, supplier selection, installation and markup stay with you. We don't check impact ratings, design pressures or product approvals: whether a product suits an opening is for the design professional and the building department.
Scope: reading and quantifying what is drawn, item counts, measurements, and organized lists. Not engineering judgment, not structural calculation, not code compliance review, and not a substitute for a licensed engineer's seal where one is required.
Other trades
FAQ
Common questions
Both counts are shown and the difference goes on the questions list. You decide which governs, or ask the architect, before the count is final.
No. If the schedule lists a product approval or NOA number, it is copied as written. Whether a product meets the requirements for an opening is for the design professional and the building department.
Only where a hardware schedule assigns sets. Without one, doors are counted and hardware is listed as excluded.
Yes, if they are drawn or scheduled and in your scope, each as its own row.
Plans first · Scope review before quote
Bidding doors & windows? Send the plans.
Scope, turnaround and a fixed price are confirmed with you after the plans are reviewed. Sending them doesn't commit you to anything.