Home / Framing takeoff
Quantity takeoff · Framing
Framing takeoffs, counted from the sheets
Linear feet of wall by wall type, studs at the spacing drawn, plates, headers from the header schedule and sheathing area, organized by level and traced to the sheet. For wood and light-gauge framing on Florida residential and light commercial projects.
What gets counted
Quantities, units and the sheets they come from.
- Walls
- LF by wall type and height, exterior and interior separate. From the floor plans and wall-type legend.
- Studs
- EA at the spacing shown on the plans or wall-type detail. Extra studs at corners and openings follow a rule you state in the scope; otherwise they are listed as excluded.
- Plates
- LF of bottom and top plates, single or double as the wall-type detail shows.
- Headers
- EA by size and length from the header schedule or as called out on plan.
- Sheathing
- SF of wall and roof sheathing where drawn, by type, openings deducted.
- Connectors
- EA only where the plans or schedules call them out, copied as written.
Illustrative sample
What the rows look like
| Item | Location | Sheet ref | Qty | Unit | Note |
|---|---|---|---|---|---|
| Wood studs, 2x4 at 16 in. | Level 1 partitions | A-101 | 186 | LF of wall | Wall type W1 |
| Wood studs, 2x6 at 16 in. | Level 1 exterior walls | A-101 | 214 | LF of wall | Wall type W2 |
| Header, (2) 2x10 | Level 1 openings | S-201 | 11 | EA | Per header schedule |
| Wall sheathing, 7/16 in. OSB | Exterior walls | A-301 | 2,030 | SF | Openings deducted |
Swipe the table sideways to see every column
Questions log · illustrative
- Q-01 · S-201 · Header H4 is called out on plan but missing from the header schedule. Confirm the size.
- Q-02 · A-101 · Stud spacing at the garage wall isn't shown. Confirm 16 in. on center before counting.
Fictional plan set and quantities shown for demonstration only, not a client project. Anything unclear in the drawings is listed as a question for you, not guessed.
How it's measured
Counted from the documents. Traced to the sheet. Questions, not guesses.
01 Spacing as drawn
Stud counts use the spacing on the plans. Where none is shown, that's a question, not an assumption.
02 Members as specified
Sizes, grades and headers are copied from the drawings and schedules. We don't size, substitute or design members.
03 Level by level
Quantities are split by level and wall type, so you can stage material and compare sub bids line by line.
What stays with you
Your prices. Your estimate.
Lumber prices, cut lists and waste, labor and markup stay with you. We don't size members, check spans or decide connector requirements: we count what the plans and schedules show.
Scope: reading and quantifying what is drawn, item counts, measurements, and organized lists. Not engineering judgment, not structural calculation, not code compliance review, and not a substitute for a licensed engineer's seal where one is required.
Other trades
FAQ
Common questions
No. Headers, members and connectors are counted as they appear on the plans and schedules. Sizing and design belong to the design professional on the project. If something is missing or contradictory, it is listed as a question.
Only where the plans or schedules call them out, by type and count, copied as written. If the drawings show a typical detail without locations, that goes on the questions list instead of being estimated.
Either, as drawn. Light-gauge steel framing is counted the same way: linear feet of wall by type, studs at the drawn spacing, and track by length.
The takeoff lists members by size from the drawings. A cut-optimized lumber list involves waste and layout decisions that stay with you or your supplier.
Plans first · Scope review before quote
Bidding framing? Send the plans.
Scope, turnaround and a fixed price are confirmed with you after the plans are reviewed. Sending them doesn't commit you to anything.